

Hammer Test
The Hammer test shall provide visual notifications to guide the end-user through the physical steps required. Similar to the Vibration Analysis, the collated data shall be displayed in real-time graphically as both a Spectrum and Time Waveform.
Upon initial selection, the end-user shall be asked to confirm that the paired Chi sensor is mounted and that an area of the tested plant is ready to be struck.
After being struck, the Chi application will require a short time to generate the output.